guides:pre_launch_checklist
Differences
This shows you the differences between two versions of the page.
Both sides previous revisionPrevious revisionNext revision | Previous revision | ||
guides:pre_launch_checklist [2006/12/29 17:49] – rocketboy | guides:pre_launch_checklist [2016/03/25 17:57] (current) – Very minor grammar changes arjunnaha | ||
---|---|---|---|
Line 1: | Line 1: | ||
====== Pre-Launch Checklist ====== | ====== Pre-Launch Checklist ====== | ||
- | == 1 Month: == | + | == 1 month before: == |
* Get CAA permission (which includes NOTAM) | * Get CAA permission (which includes NOTAM) | ||
* Order Balloons | * Order Balloons | ||
Line 9: | Line 9: | ||
* Monitor Jet Stream predictions | * Monitor Jet Stream predictions | ||
- | == The Day before: == | + | == The day before: == |
- | * Check Wind predictions | + | * Check Wind predictions |
* Systems check | * Systems check | ||
* Pick up helium + filling attachments | * Pick up helium + filling attachments | ||
+ | * Charge things that need charging: PC, Receiver, GPS, PMR | ||
- | == The day take: == | + | == On the day take: == |
* CAA Permit | * CAA Permit | ||
+ | * Telephone Numbers: ATC - local airfields, emergency services | ||
* Payload, batteries (+ spares) RADAR reflector, parachute, cutdown (+ spares) | * Payload, batteries (+ spares) RADAR reflector, parachute, cutdown (+ spares) | ||
* Balloons, Cable ties, cord, duck tape | * Balloons, Cable ties, cord, duck tape | ||
* Helium, regulator, filling system | * Helium, regulator, filling system | ||
* Tools inc. Spanners set up filling system | * Tools inc. Spanners set up filling system | ||
- | * Radio System: Receiver, Yagi, Stand, PC, Software, Audio-lead | + | |
+ | | ||
* Ancillary stuff like: Table, Chairs, | * Ancillary stuff like: Table, Chairs, | ||
- | * Recovery: GPS, long pole (for trees), string | + | * Recovery: GPS, long pole (for trees), string, PMR (intra recovery team comms) |
* Boots/Wet weather clothes Sun Hat/ | * Boots/Wet weather clothes Sun Hat/ | ||
- | On the Day do: | + | == On the day do: == |
* Final Systems check: Payload, GPS, Radio, receiver, Cutdown test | * Final Systems check: Payload, GPS, Radio, receiver, Cutdown test | ||
* Set up radio receiver + software | * Set up radio receiver + software | ||
Line 34: | Line 37: | ||
* Test each payload is transmitting correct information | * Test each payload is transmitting correct information | ||
* Fill balloon, tie neck attach payloads | * Fill balloon, tie neck attach payloads | ||
- | * Negociate | + | * Negotiate |
* Check sky is clear | * Check sky is clear | ||
* Launch | * Launch | ||
* Monitor radio signals | * Monitor radio signals | ||
* Drive to predicted recovery zone | * Drive to predicted recovery zone | ||
- | |||
- | |||
- | |||
- | |||
- | |||
- | NOTAM | ||
- | Prepare balloons for filling, (+ spare balloon?) | ||
- | Wind prediction software | ||
- | |||
- | Things to bring to launch: | ||
- | |||
- | Payloads including batteries + spare | ||
- | RTTY software | ||
- | |||
- | |||
- | Checklist for launch day: | ||
- | Launch decision based on weather forecast etc. | ||
- | Check wind prediction software (?) | ||
- | |||
- | |||
- | |||
- | |||
- | |||
- | |||
- | |||
- | |||