====== Pre-Launch Checklist ====== | ====== Pre-Launch Checklist ====== | ||
- | == 1 Month: == | + | == 1 month before: == |
* Get CAA permission (which includes NOTAM) | * Get CAA permission (which includes NOTAM) | ||
* Order Balloons | * Order Balloons | ||
Line 9: | Line 9: | ||
* Monitor Jet Stream predictions | * Monitor Jet Stream predictions | ||
- | == The Day before: == | + | == The day before: == |
- | * Check Wind predictions | + | * Check Wind predictions |
* Systems check | * Systems check | ||
+ | * Pick up helium + filling attachments | ||
+ | * Charge things that need charging: PC, Receiver, GPS, PMR | ||
- | == The day take: == | + | == On the day take: == |
- | * Payload | + | * CAA Permit |
+ | * Telephone Numbers: ATC - local airfields, emergency services | ||
+ | * Payload, batteries (+ spares) RADAR reflector, parachute, cutdown (+ spares) | ||
* Balloons, Cable ties, cord, duck tape | * Balloons, Cable ties, cord, duck tape | ||
- | * Helium, regulator, | + | * Helium, regulator, |
- | * Radio System: Receiver, Yagi, Stand, PC, Software, Audio-lead | + | * Tools inc. Spanners set up filling system |
+ | * Scales, weights. | ||
+ | * Radio System: Receiver, Yagi, Stand, PC, Software, Audio-lead, Batteries (+ spares) | ||
+ | * Ancillary stuff like: Table, Chairs, | ||
+ | * Recovery: GPS, long pole (for trees), string, PMR (intra recovery team comms) | ||
+ | * Boots/Wet weather clothes Sun Hat/ | ||
+ | |||
+ | == On the day do: == | ||
+ | * Final Systems check: Payload, GPS, Radio, receiver, Cutdown test | ||
+ | * Set up radio receiver + software | ||
+ | * Check for any downlink frequency clashes | ||
+ | * Connect up train | ||
+ | * Connect up cutdowns | ||
+ | * Power up each payload | ||
+ | * Test each payload is transmitting correct information | ||
+ | * Fill balloon, tie neck attach payloads | ||
+ | * Negotiate launch with local ATC | ||
+ | * Check sky is clear | ||
+ | * Launch | ||
+ | * Monitor radio signals | ||
+ | * Drive to predicted recovery zone | ||