UKHAS Wiki

UK High Altitude Society

User Tools

Site Tools


projects:habe

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
Next revision
Previous revision
projects:habe [2011/07/12 18:06] – [Sponsors] acudworthprojects:habe [2012/02/23 17:32] (current) – [Sponsors] acudworth
Line 4: Line 4:
 ===== Overview ===== ===== Overview =====
  
-This is a A Level Student run project based in Worcester.+This is a A Level Student run project based in Worcester. Blog - http://habe.acudworth.co.uk/blog
  
-At the moment I am in the planning stage for our first launch (HABE 1). The name has been decided HABE 1 The Explorer! +HABE 1 was a partial success full run down on my blog - http://habe.acudworth.co.uk/blog 
-Our aim is to reach an altitude of around 30km and to test all the equipmentOnce we have a working system then we can use it as a foundation to launch later experiments on.+Now I have a working tracking system, different experiments can now be carried out. HABE 2 is planned for launch in early August.
  
 More info coming soon! More info coming soon!
Line 32: Line 32:
 The payload is now complete and final testing has commenced. If no significant problems are encountered then pending CAA clearance (still haven't received), helium and weather conditions HABE 1 should be set to launch in around 4 weeks from now. The payload is now complete and final testing has commenced. If no significant problems are encountered then pending CAA clearance (still haven't received), helium and weather conditions HABE 1 should be set to launch in around 4 weeks from now.
  
 +**__Update: 12/07/11__**
  
-===== Launch Status - HABE 2 =====+Well, HABE 1 was a partial success! Apart from complete camera failure the rest worked very well indeed, so overall, I'm very pleased with the flight. I have since created a blog where future updates will be posted (before they hit the wiki here!). So, check it out - http://habe.acudworth.co.uk/blog
  
-**__Update: 12/07/11__** 
  
-**//__CURRENT LAUNCH DATE: Early August__//**+===== Launch Status - HABE 3 ===== 
 + 
 +**__Update: 16/02/12__** 
 + 
 +**//__CURRENT LAUNCH DATE: Spring/Summer 2012__//**
  
  
-CAA Permission - Received - Cleared for launch between 1st & 5th August+CAA Permission - Too far in advance.
  
 Landing Predictions - Too far in advance. Landing Predictions - Too far in advance.
  
-Launch Status - Not Ready - Build in progress+Launch Status - Not Ready
  
  
Line 95: Line 99:
      
   * TIMSTAR Laboratory Suppliers - Supplied 2 50M Rolls Of Braided Nylon Cord (1mm diameter) - http://www.timstar.co.uk   * TIMSTAR Laboratory Suppliers - Supplied 2 50M Rolls Of Braided Nylon Cord (1mm diameter) - http://www.timstar.co.uk
 +
 +  * Solarbotics - Supplied 2 37x66mm Solar Cells - http://www.solarbotics.com
  
   * Hindleys - Supplied 3 big styrofoam sheets - http://www.hindleys.com   * Hindleys - Supplied 3 big styrofoam sheets - http://www.hindleys.com
  
   * RoboSavvy - Supplied an arduino UNO - http://www.robosavvy.co.uk   * RoboSavvy - Supplied an arduino UNO - http://www.robosavvy.co.uk
 +
 +  * Plastock - Supplied 4 x 4mm sheets of polycarbonate - http://www.plastock.co.uk
 +
 +  * Alpha Micro - Supplied a uBlox 6 NEO-6Q GPS module - http://www.alphamicro.net/
 +
 +  * Richardson RFPD - Supplied 2 Sarantel GPS antennas - http://www.richardsonrfpd.com/
      
  
  