projects:gever
Differences
This shows you the differences between two versions of the page.
Both sides previous revisionPrevious revisionNext revision | Previous revision | ||
projects:gever [2011/01/17 22:10] – orc886 | projects:gever [2011/02/02 17:41] (current) – orc886 | ||
---|---|---|---|
Line 1: | Line 1: | ||
=====The GEVER HAB Project===== | =====The GEVER HAB Project===== | ||
====Background==== | ====Background==== | ||
- | Started at January 2011, this is probably the first HAB project at UKHAS and maybe the first independent project in Israel. | + | Started at January 2011, this is probably the first Israeli |
====Design Principles==== | ====Design Principles==== | ||
* An upgradable platform (Components would be as separated as possible to allow flexible upgrading) | * An upgradable platform (Components would be as separated as possible to allow flexible upgrading) | ||
====Current Challenges==== | ====Current Challenges==== | ||
* Landing - Because of the small size of Israel, the payload will have to navigate itself to a predefined area (a 10 km radius is OK). | * Landing - Because of the small size of Israel, the payload will have to navigate itself to a predefined area (a 10 km radius is OK). | ||
+ | * 1/2/2011 - Getting an approval for the design of the HAB from the Israeli UAV committee - Further design an purchase of components will be delayed until such approval is given. |
projects/gever.1295302222.txt.gz · Last modified: 2011/01/17 22:10 by orc886