projects:gever
Differences
This shows you the differences between two versions of the page.
Both sides previous revisionPrevious revisionNext revision | Previous revision | ||
projects:gever [2011/01/17 22:07] – orc886 | projects:gever [2011/02/02 17:41] (current) – orc886 | ||
---|---|---|---|
Line 1: | Line 1: | ||
- | ===The GEVER HAB Project=== | + | =====The GEVER HAB Project===== |
- | ==Background== | + | ====Background==== |
- | Started at January 2011, this is probably the first HAB project at UKHAS and maybe the first independent project in Israel. | + | Started at January 2011, this is probably the first Israeli |
- | ==Design Principles== | + | ====Design Principles==== |
- | * An upgradable platform (Components would be as separated as possible to allow flexible upgrading) | + | * An upgradable platform (Components would be as separated as possible to allow flexible upgrading) |
- | ==Current Challenges== | + | ====Current Challenges==== |
- | * Landing - Because of the small size of Israel, the payload will have to navigate itself to a predefined area (a 10 km radius is OK). | + | * Landing - Because of the small size of Israel, the payload will have to navigate itself to a predefined area (a 10 km radius is OK). |
+ | * 1/2/2011 - Getting an approval for the design of the HAB from the Israeli UAV committee - Further design an purchase of components will be delayed until such approval is given. |
projects/gever.1295302072.txt.gz · Last modified: 2011/01/17 22:07 by orc886